College Avenue Pictures June 12, 2013

College Avenue Update, June 13, 2013

Next week, Draper Road will be open as well as the turn lanes on Main Street. Work still needs to be done in the Draper Road area, so there will be flaggers as needed.

Brick and concrete work continues. The sidewalk between Gillie’s and Happy Wok will be heavily impacted with detours as the colored concrete is poured.

Thanks for your patience everyone. We are hitting the home stretch!

College Avenue Update June 6, 2013

This monsoon we are having has put a damper (no pun intended) on construction plans today and tomorrow, as a result, there will be no left turn on to Draper Road from College Avenue until June 14. To allow for concrete pouring, there will be intermittent road closures on College Avenue all of next week. Emergency vehicles will have access at all times.

Also, the turn lanes on Main Street to College Avenue will be closed. Turns can be made from the main travel lane.

Project Pictures from May 31, 2013

College Avenue Update May 30, 2013

The subcontractors did not finish pouring all the concrete, so today’s update will be similar to last week’s.

There will be no left turn on to Draper Road from College Avenue until June 8

To allow for concrete pouring, there will be intermittent road closures on College Avenue the rest of this week and all of next week. Emergency vehicles will have access at all times.

Also, the turn lanes on Main Street to College Avenue will be closed. Turns can be made from the main travel lane.

College Avenue Update May 23, 2013

There will be no work on Monday, May 27.

There will be no left turn on to Draper Road from College Avenue until June 1.

To allow for concrete pouring, there will be intermittent road closures on College Avenue Wednesday, May 29 – Friday, May 31, 7 am – 7 pm. Emergency vehicles will have access at all times.

Also, the turn lanes on Main Street to College Avenue will be closed. Turns can be made from the main travel lane.

All concrete should be poured next week, weather depending.

No Left Turns on Draper From College, May 22

Crews on the College Avenue Promenade project need to do a concrete pour at Draper tomorrow, May 22. As a result, there will be NO left turns from College Avenue on to Draper Road. However traffic can turn from Draper to College.

College Avenue Update May 17, 2013

Electric work will be complete on Tuesday. There will be a concrete pour on Tuesday, May 21 and stone will be placed for concrete. As s result, College Avenue will be closed to traffic 7 am-7 pm on Tuesday, May 21. Sidewalks will still be accessible and emergency vehicles will have access to College Avenue. The rest of this week will see intermittent road closures on College Avenue.

College Avenue Update May 9, 2013

Now that the rain has stopped, construction continues.

Silva cell installation continues this week. On Tuesday and/or Wednesday, crews will work on power installation which requires them to go across Draper Road near Gillie’s. There will be flaggers in the area to direct traffic.

May 1, 2013 Update

This week, the biobasins should be complete.

Next Monday, work will begin on the silva cells. We posted about silva cells a while ago http://blacksburg.bev.net/Promenade/?p=311

Electrical conduit will be placed from Jimmy John’s to Main Street.