February 20, 2013 Update

Today will see the installation of a storm drain across Yale at Blacksburg Estates.

Casing for a force main upgrade will start on Thursday.

Utility work will continue around Northside and the Blacksburg Estates entrance.

 

From wisegeek.org:

“A force main is a pressurized main pipe that can carry water, sewage, and other materials. Forced mains, as they are also known, are used in a variety of setting. Some systems combine this pipe with other types of mains, as terrain and circumstances change, to make sure that the needs of the system will be met. Such piping is typically installed by sanitation workers, who are also responsible for maintaining it in a fit condition so that public health risks are not created.”

Comments

  • Jerald
  • February 26th, 2013 at 10:16 am

It is good to see progress. At the same time, I will be glad when all the mess is cleaned up. Currently it’s a really muddy walk without a sidewalk from Carroll Drive to the bus stop on Whipple.